KEM Electric's Logo
Home » Customer Service » Rate Schedules » Schedule GD

Schedule GD

Grain Dryer/Aeration Service

Availability

Available for single phase and multi-phase grain drying/aeration metered accounts for the sole purpose. 

Type of Service

Single or Three phase, 60 cycle at available secondary voltages.

Rate

Facility Charge     $25.00 per month or

                        $30.00 per month for Limited Use Accounts, plus

Energy Charge:

First 1,000 kWh per month @ 9.1 cents per KWH
Next 1,000 kWh per month @ 8.2 cents per KWH
All Over 2,000 kWh per month @ 7.1 cents per KWH

Single Phase (over 50 kW) and 3 Phase, 
60 Cycle at Available Secondary Voltages

Facility Charge    $28.00 per month or

                        $33.00 per month for Limited Use Accounts, plus

Energy Charge:

First 1,000 kWh per month @ 7.8 cents per kWh
Next 2,000 kWh per month @ 6.6 cents per kWh                                Next 2,000 kWh per month @ 4.8 cents per kWh                                Over 5,000 kWh per month @ 4.2 cents per kWh                                Primary voltage Discount @ 8.0%

 Controlled

The Cooperative will install and maintain the necessary load control equipment, sub-meters and meter bases.  Participation for a period of five years is required. 

For demand metered accounts, the registered kW will be credited or waived.  Energy Charge        All kWh per month @ 4.38 cents per kWh

Limited Use Accounts

Limited use accounts with usage of less than 1800 kWh in a full calendar year.  Usage will be evaluated annually in January to determine the facility charge to be used in the coming twelve (12) months.

Terms of Payment

The above rates are net.  A late payment penalty of 1 3/4% per month will be added to any unpaid balance. 

KEM Electric Cooperative, Inc. :: Copyright © All Rights Reserved
107 S Broadway :: PO Box 790 :: Linton, ND 58552 :: 701.254.4666 :: kem@kemelectric.com
Site Developed in part by Basin Electric Power Cooperative