SCHEDULE H1 - S

Dual Heat with No Load Control Equipment

Availability

Available to consumers receiving service under Schedule S - Single Phase Secondary Service and participating in the Dual Heat Program with no load management equipment/no control.

Type of Service

The Cooperative will install sub-meters and meter bases.

Rate

The rate will be 3.9¢ per KWH for all KWHs metered between October 1 and May 1.

The rate will be re-evaluated each year.

Terms

The member will be responsible to have metering equipment installed as per design recommended by Cooperative.  The member will read meter and provide such accurate readings to Cooperative on 1st of each month.

SCHEDULE H1 - T

Dual Heat With No Load Control Equipment

Availability

Available to consumers receiving service under Schedule T - Multi-Phase Secondary Service and participating in the Dual Heat Program with no load control equipment/no control.

Type of Service

The Cooperative will install and maintain the necessary sub-meters and meter bases.

Rate

The dual heat rate will be 3.9¢ per KWH.

KW registered on sub-meter to be credited on bill computation at $8.70 per KW.

This rate will be for all sub-metered KWHs and KWs during the period of October 1 to May 1.

The rate will be re-evaluated each year.

Terms

The member will be responsible to have metering equipment installed as per design recommended by the Cooperative. 

KEM Electric Cooperative, Inc. :: Copyright © All Rights Reserved
107 S Broadway :: PO Box 790 :: Linton, ND 58552 :: 701.254.4666 :: kem@kemelectric.com
Site Developed in part by Basin Electric Power Cooperative