
Available to consumers receiving service under Schedule S - Single Phase Secondary Service and participating in the Dual Heat, Central Air Conditioning, and/or Off-Peak Domestic Water Heating Programs.
The Cooperative will install and maintain the necessary load control equipment, sub-meters and meter bases.
Dual Heat, Central Air Conditioning, Grain Drying and/or Storage Water Heaters 3.7 cents per KWH.
Controlled Off-Peak Domestic Water Heating
All Water Heaters $5.00 Credit Per Month provided usage on the meter is at least 800 kWh per month.
Dual Heat and Central Air Conditioning
Participation for a minimum of three years required, or the cost of any incentives received must be returned to the Cooperative.
Available to consumers receiving service under Schedule T - Multi-Phase Secondary Service and participating in the Dual Heat, Central Air Conditioning, Grain Drying and/or Off-Peak Domestic Water Heating Programs.
The Cooperative will install and maintain the necessary load control equipment, sub-meters and meter bases.
Dual Heat, Central Air Conditioning,and/or Storage Water Heaters 3.7 cents per KWH.
KW registered on sub-meter to be credited on bill computation at $8.70 per KW.
Controlled Off-Peak Domestic Water Heating
All Water Heaters $5.00 Credit Per Month provided usage on the meter is at least 800 kWh per month.
Dual Heat and Central Air Conditioning
Participation for a minimum of three years required, or the cost of any incentives received must be returned to the Cooperative.